North Hollywood

WBS53AZ01MCG37064 | 2021 BMW M4

  • VIN VIN

    WBS53AZ01MCG37064

  • Model Year Model Year

    2021

  • Total Drove Total Drove

    46,134 mil

  • Transmission Transmission

    Manual

  • Engine Capacity Engine Capacity

    Gasoline

Vehicle Main Features

On this page, you will discover the complete profile of the 2021 BMW M4, including its full iaai bid history and auction history. This 2021 BMW M4 has been meticulously cataloged to provide you with every detail: VIN WBS53AZ01MCG37064, trim, Green exterior, and a powerful 3.0L I-6 DI, DOHC, VVT, turbo, 473HP engine running on Gasoline. With Manual transmission and Rear Wheel Drive drive, this BMW demonstrates superior performance and reliability.

Enter VIN WBS53AZ01MCG37064 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS53AZ01MCG37064 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document () for authenticity and full transparency.

Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on the auction date, and verify the mileage of 46,134 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M4 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.

  • Engine Capacity Engine Capacity : 46,134 mil
  • Fuel Fuel : Gasoline
  • Color Color : Green
  • Keys Keys : Key Available
  • Body Type Body Type : Coupe
  • Transmission Transmission : Manual
  • Engine Engine : 3.0L I-6 DI, DOHC, VVT, turbo, 473HP
  • Drive line Drive line : Rear Wheel Drive
  • Damage Damage : Front End
  • Auction Auction : iaai
  • Location Location : North Hollywood
  • Seller Seller : Mercury Insurance

Similar Vehicles

Auction: iaai
  • 47,722 mil
  • Automatic
  • Gasoline
  • All-Wheel Drive
Auction: iaai
  • 1 mil
  • Automatic
  • Gasoline
  • All-Wheel Drive
Auction: iaai
  • 111,919 mil
  • Automatic
  • Gasoline
  • Front Wheel Drive
Auction: iaai
  • 76,631 mil
  • Automatic
  • Flexible Fuel
  • Four Wheel Drive
Auction: iaai
  • 21,059 mil
  • Automatic
  • Gasoline
  • Front Wheel Drive
Auction: iaai
  • 49,864 mil
  • Automatic
  • Electric
  • All-Wheel Drive