WBS53AZ01RCP13984 | 2024 BMW M4
- Copart
- Lot #: 75922154
Vehicle Main Features
On this page, you will discover the complete profile of the 2024 BMW M4, including its full copart bid history and auction history. This 2024 BMW M4 has been meticulously cataloged to provide you with every detail: VIN WBS53AZ01RCP13984, trim, BLACK exterior, and a powerful 3.0L 6 engine running on GAS. With MANUAL transmission and Rear-wheel drive drive, this BMW demonstrates superior performance and reliability.
Enter VIN WBS53AZ01RCP13984 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS53AZ01RCP13984 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document (CA SC) for authenticity and full transparency.
Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on the auction date, and verify the mileage of 2,904 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M4 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.
-
Engine Capacity :
2,904 mil
-
Fuel :
GAS
-
Color :
BLACK
-
Keys :
NO
-
Transmission :
MANUAL
-
Engine :
3.0L 6
-
Drive line :
Rear-wheel drive
-
Damage :
FRONT END REAR END
-
Auction :
copart
-
Location :
CA - SAN JOSE
Similar Vehicles
7SAYGDEE8RF084497 TESLA MODEL Y 2024 Not sold
-
5,932 mil
-
AUTOMATIC
-
ELECTRIC
-
All wheel drive
-
14,062 mil
-
AUTOMATIC
-
GAS
-
All wheel drive
-
17,780 mil
-
AUTOMATIC
-
GAS
-
Front-wheel Drive
WAUB4AF42KA034240 AUDI S4/RS4 2019 Not sold
-
45,953 mil
-
AUTOMATIC
-
GAS
-
All wheel drive
-
56,098 mil
-
AUTOMATIC
-
GAS
-
Front-wheel Drive
4T3T6RFVXNU082809 TOYOTA RAV4 2022 Not sold
-
115,656 mil
-
AUTOMATIC
-
HYBRID ENGINE
-
All wheel drive