WBS83CH00MCH42382 | 2021 BMW M5 M5

  • VIN VIN

    WBS83CH00MCH42382

  • Model Year Model Year

    2021

  • Total Drove Total Drove

    616 mil

  • Transmission Transmission

    AUTOMATIC

  • Engine Capacity Engine Capacity

    GAS

Vehicle Main Features

On this page, you will discover the complete profile of the 2021 BMW M5, including its full copart bid history and auction history. This 2021 BMW M5 has been meticulously cataloged to provide you with every detail: VIN WBS83CH00MCH42382, M5 trim, BLUE exterior, and a powerful 4.4L 8 engine running on GAS. With AUTOMATIC transmission and All wheel drive drive, this BMW demonstrates superior performance and reliability.

Enter VIN WBS83CH00MCH42382 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS83CH00MCH42382 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document (CA SC) for authenticity and full transparency.

Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on 9 Sep 2022, and verify the mileage of 616 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M5 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.

  • Engine Capacity Engine Capacity : 616 mil
  • Fuel Fuel : GAS
  • Color Color : BLUE
  • Keys Keys : YES
  • Transmission Transmission : AUTOMATIC
  • Engine Engine : 4.4L 8
  • Drive line Drive line : All wheel drive
  • Damage Damage : REAR END UNDERCARRIAGE
  • Auction Auction : copart

Similar Vehicles

Auction: copart
  • 8,453 mil
  • AUTOMATIC
  • HYBRID ENGINE
  • Front-wheel Drive
Auction: copart
  • 2,623 mil
  • AUTOMATIC
  • GAS
  • 4x4 w/Rear Wheel Drv
Auction: copart
  • AUTOMATIC
  • ELECTRIC
  • All wheel drive
Auction: copart
  • 40,619 mil
  • AUTOMATIC
  • GAS
  • Front-wheel Drive
Auction: copart
  • 11,553 mil
  • AUTOMATIC
  • ELECTRIC
  • All wheel drive
Auction: copart
  • 29,724 mil
  • AUTOMATIC
  • GAS
  • Front-wheel Drive