North Hollywood

WBS83CH01PCN02954 | 2023 BMW M5

  • VIN VIN

    WBS83CH01PCN02954

  • Model Year Model Year

    2023

  • Total Drove Total Drove

    13,064 mil

  • Transmission Transmission

    Automatic

  • Engine Capacity Engine Capacity

    Gasoline

Vehicle Main Features

On this page, you will discover the complete profile of the 2023 BMW M5, including its full iaai bid history and auction history. This 2023 BMW M5 has been meticulously cataloged to provide you with every detail: VIN WBS83CH01PCN02954, trim, Black exterior, and a powerful 4.4L V-8 DI, DOHC, VVT, turbo, 600HP engine running on Gasoline. With Automatic transmission and All-Wheel Drive drive, this BMW demonstrates superior performance and reliability.

Enter VIN WBS83CH01PCN02954 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS83CH01PCN02954 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document (Salvage) for authenticity and full transparency.

Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on 26 Feb 2025, and verify the mileage of 13,064 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M5 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.

  • Engine Capacity Engine Capacity : 13,064 mil
  • Fuel Fuel : Gasoline
  • Color Color : Black
  • Body Type Body Type : Sedan
  • Transmission Transmission : Automatic
  • Engine Engine : 4.4L V-8 DI, DOHC, VVT, turbo, 600HP
  • Drive line Drive line : All-Wheel Drive
  • Damage Damage : Front & Rear
  • Auction Auction : iaai
  • Location Location : North Hollywood
  • Seller Seller : State Farm Group Insurance

Similar Vehicles

Auction: iaai
  • 16,665 mil
  • Automatic
  • Gasoline
  • Rear Wheel Drive
Auction: iaai
  • 6,721 mil
  • Automatic
  • Gasoline
  • Four Wheel Drive
Auction: iaai
  • 135,786 mil
  • Automatic
  • Gasoline
  • Front Wheel Drive
Auction: iaai
  • 41,580 mil
  • Automatic
  • Gasoline
  • All-Wheel Drive
Auction: iaai
  • 75,098 mil
  • Automatic
  • Gasoline
Auction: iaai
  • 1 mil
  • Automatic
  • Gasoline
  • Front Wheel Drive