AL - BIRMINGHAM

WBS83CH03MCG36024 | 2021 BMW M5

  • VIN VIN

    WBS83CH03MCG36024

  • Model Year Model Year

    2021

  • Transmission Transmission

    AUTOMATIC

  • Engine Capacity Engine Capacity

    GAS

Vehicle Main Features

On this page, you will discover the complete profile of the 2021 BMW M5, including its full copart bid history and auction history. This 2021 BMW M5 has been meticulously cataloged to provide you with every detail: VIN WBS83CH03MCG36024, trim, GRAY exterior, and a powerful 4.4L 8 engine running on GAS. With AUTOMATIC transmission and All wheel drive drive, this BMW demonstrates superior performance and reliability.

Enter VIN WBS83CH03MCG36024 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS83CH03MCG36024 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document (FL RB) for authenticity and full transparency.

Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on the auction date, and verify the mileage of 0 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M5 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.

  • Fuel Fuel : GAS
  • Color Color : GRAY
  • Keys Keys : YES
  • Transmission Transmission : AUTOMATIC
  • Engine Engine : 4.4L 8
  • Drive line Drive line : All wheel drive
  • Damage Damage : FRONT END REAR END
  • Auction Auction : copart
  • Location Location : AL - BIRMINGHAM

Similar Vehicles

Auction: copart
  • 47,458 mil
  • AUTOMATIC
  • GAS
  • Rear-wheel drive
Auction: copart
  • 22,629 mil
  • AUTOMATIC
  • GAS
  • All wheel drive
Auction: copart
  • 56,991 mil
  • AUTOMATIC
  • GAS
  • Rear-wheel drive
Auction: copart
  • 8,692 mil
  • AUTOMATIC
  • GAS
  • Front-wheel Drive
Auction: copart
  • 68,523 mil
  • AUTOMATIC
  • GAS
  • Front-wheel Drive
Auction: copart
  • 53,804 mil
  • AUTOMATIC
  • GAS
  • Front-wheel Drive