WBS83CH05PCN31955 | 2023 BMW M5
- Iaai
- Lot #: 43866079
Vehicle Main Features
On this page, you will discover the complete profile of the 2023 BMW M5, including its full iaai bid history and auction history. This 2023 BMW M5 has been meticulously cataloged to provide you with every detail: VIN WBS83CH05PCN31955, trim, White exterior, and a powerful 4.4L V-8 DI, DOHC, VVT, turbo, 617HP engine running on Gasoline. With Automatic transmission and All-Wheel Drive drive, this BMW demonstrates superior performance and reliability.
Enter VIN WBS83CH05PCN31955 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS83CH05PCN31955 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document () for authenticity and full transparency.
Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on the auction date, and verify the mileage of 35,040 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M5 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.
-
Engine Capacity :
35,040 mil
-
Fuel :
Gasoline
-
Color :
White
-
Body Type :
Sedan
-
Transmission :
Automatic
-
Engine :
4.4L V-8 DI, DOHC, VVT, turbo, 617HP
-
Drive line :
All-Wheel Drive
-
Damage :
Biohazard Front End
-
Auction :
iaai
-
Location :
Long Island
-
Seller :
State Farm Group Insurance
Similar Vehicles
5XYK33DF7RG147715 KIA SPORTAGE 2024 No result
-
36,955 mil
-
Automatic
-
Gasoline
-
Front Wheel Drive
58ADZ1B15MU108376 LEXUS ES 350 2021 No result
-
127,819 mil
-
Automatic
-
Gasoline
-
Front Wheel Drive
1FMCU0G60MUA90451 FORD ESCAPE 2021 No result
-
121,643 mil
-
Automatic
-
Gasoline
-
Front Wheel Drive
5J6RS6H58SL008833 HONDA CR-V 2025 No result
-
11,954 mil
-
Automatic
-
Hybrid
-
All-Wheel Drive
5UX23EU08R9T88044 BMW X5 2024 No result
-
6,036 mil
-
Automatic
-
Gasoline
-
All-Wheel Drive
5YMJU0C08N9K56854 BMW X5 M 2022 No result
-
45,235 mil
-
Automatic
-
Gasoline
-
All-Wheel Drive