WBS83CH07MCG89017 | 2021 BMW M5
- Iaai
- Lot #: 31299512
Vehicle Main Features
On this page, you will discover the complete profile of the 2021 BMW M5, including its full iaai bid history and auction history. This 2021 BMW M5 has been meticulously cataloged to provide you with every detail: VIN WBS83CH07MCG89017, trim, Black exterior, and a powerful 4.4L TwinPower Turbo V8 engine running on Gasoline. With Automatic transmission and All-Wheel Drive drive, this BMW demonstrates superior performance and reliability.
Enter VIN WBS83CH07MCG89017 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS83CH07MCG89017 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document (SALVAGE-NJ) for authenticity and full transparency.
Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on 17 Jan 2022, and verify the mileage of 2,959 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M5 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.
-
Engine Capacity :
2,959 mil
-
Fuel :
Gasoline
-
Color :
Black
-
Keys :
Key Available
-
Body Type :
Sedan 4 Dr.
-
Transmission :
Automatic
-
Engine :
4.4L TwinPower Turbo V8
-
Drive line :
All-Wheel Drive
-
Damage :
Flood
-
Auction :
iaai
-
Location :
Englishtown
-
Seller :
Progressive Casualty Insurance
Similar Vehicles
-
30,389 mil
-
Automatic
-
Gasoline
-
Rear Wheel Drive
-
19,789 mil
-
Automatic
-
Gasoline
-
Front Wheel Drive
WA1AECF34L1084860 AUDI Q3 2020 No result
-
11,666 mil
-
Automatic
-
Gasoline
-
All-Wheel Drive
YV4BR0DL7L1553789 VOLVO XC60 2020 No result
-
13,757 mil
-
Automatic
-
Other
-
All-Wheel Drive
5YFS4MCE0MP067365 TOYOTA COROLLA 2021 No result
-
10,434 mil
-
Unknown
-
Gasoline
-
Front Wheel Drive
JTDS4MCE2MJ064892 TOYOTA COROLLA 2021 No result
-
9,557 mil
-
Unknown
-
Gasoline
-
Front Wheel Drive