CA - VAN NUYS

WBS83CH07PCN39703 | 2023 BMW M5

  • VIN VIN

    WBS83CH07PCN39703

  • Model Year Model Year

    2023

  • Total Drove Total Drove

    42,271 mil

  • Transmission Transmission

    AUTOMATIC

  • Engine Capacity Engine Capacity

    GAS

Vehicle Main Features

On this page, you will discover the complete profile of the 2023 BMW M5, including its full copart bid history and auction history. This 2023 BMW M5 has been meticulously cataloged to provide you with every detail: VIN WBS83CH07PCN39703, trim, BLACK exterior, and a powerful 4.4L 8 engine running on GAS. With AUTOMATIC transmission and ALL WHEEL DRIVE drive, this BMW demonstrates superior performance and reliability.

Enter VIN WBS83CH07PCN39703 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS83CH07PCN39703 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document (CA SC) for authenticity and full transparency.

Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on the auction date, and verify the mileage of 42,271 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M5 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.

  • Engine Capacity Engine Capacity : 42,271 mil
  • Fuel Fuel : GAS
  • Color Color : BLACK
  • Keys Keys : YES
  • Body Type Body Type : SEDAN
  • Transmission Transmission : AUTOMATIC
  • Engine Engine : 4.4L 8
  • Drive line Drive line : ALL WHEEL DRIVE
  • Damage Damage : REAR END
  • Auction Auction : copart
  • Location Location : CA - VAN NUYS

Similar Vehicles

Auction: copart
  • 14,825 mil
  • AUTOMATIC
  • ELECTRIC AND GAS HYBRID
  • ALL WHEEL DRIVE
Auction: copart
  • 61,390 mil
  • AUTOMATIC
  • GAS
  • REAR WHEEL DRIVE
Auction: copart
  • 56,166 mil
  • AUTOMATIC
  • GAS
  • FRONT WHEEL DRIVE
Auction: copart
  • 103,717 mil
  • AUTOMATIC
  • GAS
  • FRONT WHEEL DRIVE
Auction: copart
  • 32,211 mil
  • AUTOMATIC
  • GAS
  • FRONT WHEEL DRIVE
Auction: copart
  • AUTOMATIC
  • ELECTRIC
  • ALL WHEEL DRIVE