WBS83FK02SCU89103 | 2025 BMW M5
- Copart
- Lot #: 70166505
Vehicle Main Features
On this page, you will discover the complete profile of the 2025 BMW M5, including its full copart bid history and auction history. This 2025 BMW M5 has been meticulously cataloged to provide you with every detail: VIN WBS83FK02SCU89103, trim, BLUE exterior, and a powerful 4.4L 8 engine running on HYBRID ENGINE. With AUTOMATIC transmission and All wheel drive drive, this BMW demonstrates superior performance and reliability.
Enter VIN WBS83FK02SCU89103 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS83FK02SCU89103 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document (TN SC) for authenticity and full transparency.
Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on the auction date, and verify the mileage of 1,147 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M5 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.
-
Engine Capacity :
1,147 mil
-
Fuel :
HYBRID ENGINE
-
Color :
BLUE
-
Keys :
YES
-
Transmission :
AUTOMATIC
-
Engine :
4.4L 8
-
Drive line :
All wheel drive
-
Damage :
SIDE REAR END
-
Auction :
copart
-
Location :
TN - NASHVILLE
Similar Vehicles
1C4PJXDG6RW370956 JEEP WRANGLER 2024 No result
-
1,238 mil
-
AUTOMATIC
-
GAS
-
4x4 w/Rear Wheel Drv
5N1BT3BB1PC793684 NISSAN ROGUE 2023 No result
-
34,878 mil
-
AUTOMATIC
-
GAS
-
All wheel drive
-
AUTOMATIC
-
GAS
-
All wheel drive
1V2JR2CA3RC598699 VOLKSWAGEN ATLAS 2024 No result
-
15,181 mil
-
AUTOMATIC
-
GAS
-
Front-wheel Drive
KL77LFE27RC008320 CHEVROLET TRAX 2024 No result
-
103,245 mil
-
AUTOMATIC
-
GAS
-
Front-wheel Drive
5TFMC5DB7RX049766 TOYOTA TUNDRA 2024 No result
-
52,989 mil
-
AUTOMATIC
-
HYBRID ENGINE
-
4x4 w/Rear Wheel Drv