WBS83FK02TCW67948 | 2026 BMW M5
- Iaai
- Lot #: 46120871
Vehicle Main Features
On this page, you will discover the complete profile of the 2026 BMW M5, including its full iaai bid history and auction history. This 2026 BMW M5 has been meticulously cataloged to provide you with every detail: VIN WBS83FK02TCW67948, trim, Black exterior, and a powerful 4.4L V-8 DI, DOHC, VVT, turbo, premium , 577HP engine running on Hybrid. With Automatic transmission and All-Wheel Drive drive, this BMW demonstrates superior performance and reliability.
Enter VIN WBS83FK02TCW67948 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS83FK02TCW67948 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document () for authenticity and full transparency.
Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on the auction date, and verify the mileage of 8,786 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M5 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.
-
Engine Capacity :
8,786 mil
-
Fuel :
Hybrid
-
Color :
Black
-
Keys :
Key Available
-
Body Type :
Sedan
-
Transmission :
Automatic
-
Engine :
4.4L V-8 DI, DOHC, VVT, turbo, premium , 577HP
-
Drive line :
All-Wheel Drive
-
Damage :
Left Side
-
Auction :
iaai
-
Location :
St. Louis
-
Seller :
AAA Missouri
Similar Vehicles
-
34,721 mil
-
Automatic
-
Gasoline
-
Four Wheel Drive
2FMPK4J98RBA39777 FORD EDGE 2024 No result
-
32,352 mil
-
Automatic
-
Gasoline
-
All-Wheel Drive
3GNAXKEG6RL100757 CHEVROLET EQUINOX 2024 No result
-
20,723 mil
-
Automatic
-
Gasoline
-
Front Wheel Drive
5XXG14J28NG156456 KIA K5 2022 No result
-
74,801 mil
-
Automatic
-
Gasoline
-
All-Wheel Drive
-
43,879 mil
-
Automatic
-
Gasoline
-
Front Wheel Drive
JF2GTABC2PH255877 SUBARU CROSSTREK 2023 No result
-
50,424 mil
-
Automatic
-
Gasoline
-
All-Wheel Drive