WBS83FK03SCT90239 | 2025 BMW M5
- Iaai
- Lot #: 42795749
Vehicle Main Features
On this page, you will discover the complete profile of the 2025 BMW M5, including its full iaai bid history and auction history. This 2025 BMW M5 has been meticulously cataloged to provide you with every detail: VIN WBS83FK03SCT90239, trim, Green exterior, and a powerful 4.4L V-8 DI, DOHC, VVT, turbo, 577HP engine running on Hybrid. With Automatic transmission and All-Wheel Drive drive, this BMW demonstrates superior performance and reliability.
Enter VIN WBS83FK03SCT90239 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS83FK03SCT90239 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document () for authenticity and full transparency.
Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on the auction date, and verify the mileage of 6,190 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M5 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.
-
Engine Capacity :
6,190 mil
-
Fuel :
Hybrid
-
Color :
Green
-
Keys :
Key Available
-
Body Type :
Sedan
-
Transmission :
Automatic
-
Engine :
4.4L V-8 DI, DOHC, VVT, turbo, 577HP
-
Drive line :
All-Wheel Drive
-
Damage :
Rollover ALL OVER
-
Auction :
iaai
-
Location :
San Diego
-
Seller :
Progressive Casualty Insurance
Similar Vehicles
LPSED3KA0NL053491 POLESTAR 2 2022 No result
-
22,591 mil
-
Automatic
-
Electric
-
All-Wheel Drive
-
1 mil
-
Automatic
-
Gasoline
-
Four Wheel Drive
5XYRL4LC3PG183068 KIA SORENTO 2023 No result
-
1 mil
-
Automatic
-
Gasoline
-
Front Wheel Drive
5NMP24GL0SH070309 HYUNDAI SANTA FE 2025 No result
-
20,691 mil
-
Automatic
-
Gasoline
-
Front Wheel Drive
2T3P1RFV1PW363707 TOYOTA RAV4 2023 No result
-
1 mil
-
Automatic
-
Gasoline
-
All-Wheel Drive
-
1 mil
-
Automatic
-
Gasoline
-
All-Wheel Drive