North Hollywood

WBS83FK03TCV38309 | 2026 BMW M5

  • VIN VIN

    WBS83FK03TCV38309

  • Model Year Model Year

    2026

  • Total Drove Total Drove

    7,202 mil

  • Transmission Transmission

    Automatic

  • Engine Capacity Engine Capacity

    Hybrid

Vehicle Main Features

On this page, you will discover the complete profile of the 2026 BMW M5, including its full iaai bid history and auction history. This 2026 BMW M5 has been meticulously cataloged to provide you with every detail: VIN WBS83FK03TCV38309, trim, Black exterior, and a powerful 4.4L V-8 DI, DOHC, VVT, turbo, 577HP engine running on Hybrid. With Automatic transmission and All-Wheel Drive drive, this BMW demonstrates superior performance and reliability.

Enter VIN WBS83FK03TCV38309 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS83FK03TCV38309 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document () for authenticity and full transparency.

Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on the auction date, and verify the mileage of 7,202 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M5 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.

  • Engine Capacity Engine Capacity : 7,202 mil
  • Fuel Fuel : Hybrid
  • Color Color : Black
  • Keys Keys : Key Available
  • Body Type Body Type : Sedan
  • Transmission Transmission : Automatic
  • Engine Engine : 4.4L V-8 DI, DOHC, VVT, turbo, 577HP
  • Drive line Drive line : All-Wheel Drive
  • Damage Damage : Right Front Suspension
  • Auction Auction : iaai
  • Location Location : North Hollywood
  • Seller Seller : Progressive Casualty Insurance

Similar Vehicles

Auction: iaai
  • 108,607 mil
  • Automatic
  • Gasoline
  • Four Wheel Drive
Auction: iaai
  • 53,994 mil
  • Automatic
  • Gasoline
  • Front Wheel Drive
Auction: iaai
  • 105,170 mil
  • Automatic
  • Gasoline
  • Front Wheel Drive
Auction: iaai
  • 67,000 mil
  • Automatic
  • Gasoline
  • 4X2 Drive
Auction: iaai
  • 61,737 mil
  • Automatic
  • Gasoline
  • 4X2 Drive
Auction: iaai
  • 47,907 mil
  • Automatic
  • Gasoline
  • All-Wheel Drive