WBS83FK08SCU45123 | 2025 BMW M5
- Iaai
- Lot #: 44519558
Vehicle Main Features
On this page, you will discover the complete profile of the 2025 BMW M5, including its full iaai bid history and auction history. This 2025 BMW M5 has been meticulously cataloged to provide you with every detail: VIN WBS83FK08SCU45123, trim, Black exterior, and a powerful 4.4L V-8 DI, DOHC, VVT, turbo, 577HP engine running on Hybrid. With Automatic transmission and All-Wheel Drive drive, this BMW demonstrates superior performance and reliability.
Enter VIN WBS83FK08SCU45123 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS83FK08SCU45123 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document () for authenticity and full transparency.
Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on the auction date, and verify the mileage of 21,992 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M5 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.
-
Engine Capacity :
21,992 mil
-
Fuel :
Hybrid
-
Color :
Black
-
Keys :
Key Available
-
Body Type :
Sedan
-
Transmission :
Automatic
-
Engine :
4.4L V-8 DI, DOHC, VVT, turbo, 577HP
-
Drive line :
All-Wheel Drive
-
Auction :
iaai
-
Location :
North Hollywood
-
Seller :
State Farm Group Insurance
Similar Vehicles
KMHLM4AG1PU564632 HYUNDAI ELANTRA 2023 No result
-
23,358 mil
-
Automatic
-
Gasoline
-
Front Wheel Drive
KMHLS4DG2SU951412 HYUNDAI ELANTRA 2025 No result
-
21,858 mil
-
Automatic
-
Gasoline
-
Front Wheel Drive
5N1BT3BA7PC771986 NISSAN ROGUE 2023 No result
-
64,882 mil
-
Automatic
-
Gasoline
-
Front Wheel Drive
-
4,449 mil
-
Automatic
-
Gasoline
-
4X2 Drive
2HGFE2F51NH578364 HONDA CIVIC 2022 No result
-
31,027 mil
-
Automatic
-
Gasoline
-
Front Wheel Drive
JF1VBAF68N9032902 SUBARU WRX 2022 No result
-
27,750 mil
-
Manual
-
Gasoline
-
All-Wheel Drive