WBS83GV05TCW97737 | 2026 BMW M5 TOURING
- Iaai
- Lot #: 44449710
Vehicle Main Features
On this page, you will discover the complete profile of the 2026 BMW M5, including its full iaai bid history and auction history. This 2026 BMW M5 has been meticulously cataloged to provide you with every detail: VIN WBS83GV05TCW97737, TOURING trim, Blue exterior, and a powerful 4.4L V-8 DI, DOHC, VVT, turbo, 577HP engine running on Hybrid. With Automatic transmission and All-Wheel Drive drive, this BMW demonstrates superior performance and reliability.
Enter VIN WBS83GV05TCW97737 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS83GV05TCW97737 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document () for authenticity and full transparency.
Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on the auction date, and verify the mileage of 833 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M5 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.
-
Engine Capacity :
833 mil
-
Fuel :
Hybrid
-
Color :
Blue
-
Body Type :
Wagon
-
Transmission :
Automatic
-
Engine :
4.4L V-8 DI, DOHC, VVT, turbo, 577HP
-
Drive line :
All-Wheel Drive
-
Damage :
Front End
-
Auction :
iaai
-
Location :
Knoxville
-
Seller :
Tennessee Farmers Insurance
Similar Vehicles
3VV8B7AX1RM082575 VOLKSWAGEN TIGUAN 2024 No result
-
35,792 mil
-
Automatic
-
Gasoline
-
All-Wheel Drive
5N1BT3AA6TC718336 NISSAN ROGUE 2026 No result
-
3,408 mil
-
Automatic
-
Gasoline
-
Front Wheel Drive
2C3CDXHG0NH104362 DODGE CHARGER 2022 No result
-
74,571 mil
-
Automatic
-
Flexible Fuel
-
Rear Wheel Drive
1FTFW1E88NFC12291 FORD F-150 2022 No result
-
50,261 mil
-
Automatic
-
Gasoline
-
Four Wheel Drive
1FA6P8TH0R5107688 FORD MUSTANG 2024 No result
-
1 mil
-
Automatic
-
Gasoline
-
Rear Wheel Drive
2T3P1RFV1SW542628 TOYOTA RAV4 2025 No result
-
20,176 mil
-
Automatic
-
Gasoline
-
All-Wheel Drive