WBS2U7C07M7G96544 | 2021 BMW M2 COMPETITION
- Iaai
- Lot #: 31320105
Vehicle Main Features
On this page, you will discover the complete profile of the 2021 BMW M2, including its full iaai bid history and auction history. This 2021 BMW M2 has been meticulously cataloged to provide you with every detail: VIN WBS2U7C07M7G96544, COMPETITION trim, BLUE exterior, and a powerful 3.0L Inline 6-Cylinder M engine running on Gasoline. With Automatic transmission and Rear Wheel Drive drive, this BMW demonstrates superior performance and reliability.
Enter VIN WBS2U7C07M7G96544 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS2U7C07M7G96544 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document (SALVAGE CERTIFICATE-CA) for authenticity and full transparency.
Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on 15 Nov 2021, and verify the mileage of 8,423 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M2 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.
-
Engine Capacity :
8,423 mil
-
Fuel :
Gasoline
-
Color :
BLUE
-
Keys :
Present
-
Body Type :
Coupe
-
Transmission :
Automatic
-
Engine :
3.0L Inline 6-Cylinder M
-
Drive line :
Rear Wheel Drive
-
Damage :
FRONT & REAR ELECTRICAL
-
Auction :
iaai
-
Location :
Dream Rides
-
Seller :
Geico Insurance
Similar Vehicles
-
33,265 mil
-
Unknown
-
Hybrid
-
Front Wheel Drive
-
53,927 mil
-
Unknown
-
Hybrid
-
Front Wheel Drive
-
11,578 mil
-
Automatic
-
Gasoline
-
Front Wheel Drive
-
7,135 mil
-
Automatic
-
Gasoline
-
All-Wheel Drive
-
1,946 mil
-
Unknown
-
Hybrid
-
All-Wheel Drive
-
1,474 mil
-
Automatic
-
Gasoline
-
Front Wheel Drive