Dream Rides

WBS53AZ02MCF90093 | 2021 BMW M4

  • VIN VIN

    WBS53AZ02MCF90093

  • Model Year Model Year

    2021

  • Total Drove Total Drove

    54,065 mil

  • Transmission Transmission

    Manual

  • Engine Capacity Engine Capacity

    Gasoline

Vehicle Main Features

On this page, you will discover the complete profile of the 2021 BMW M4, including its full iaai bid history and auction history. This 2021 BMW M4 has been meticulously cataloged to provide you with every detail: VIN WBS53AZ02MCF90093, trim, White exterior, and a powerful 3.0L I-6 DI, DOHC, VVT, turbo, 473HP engine running on Gasoline. With Manual transmission and Rear Wheel Drive drive, this BMW demonstrates superior performance and reliability.

Enter VIN WBS53AZ02MCF90093 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS53AZ02MCF90093 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document (Bill Of Sale) for authenticity and full transparency.

Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on 28 Sep 2026, and verify the mileage of 54,065 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M4 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.

  • Engine Capacity Engine Capacity : 54,065 mil
  • Fuel Fuel : Gasoline
  • Color Color : White
  • Keys Keys : Key Available
  • Body Type Body Type : Coupe
  • Transmission Transmission : Manual
  • Engine Engine : 3.0L I-6 DI, DOHC, VVT, turbo, 473HP
  • Drive line Drive line : Rear Wheel Drive
  • Damage Damage : Front & Rear Left Side
  • Auction Auction : iaai
  • Location Location : Dream Rides
  • Seller Seller : Progressive Casualty Insurance

Similar Vehicles

Auction: iaai
  • 108,149 mil
  • Automatic
  • Gasoline
  • All-Wheel Drive
Auction: iaai
  • 56,114 mil
  • Automatic
  • Gasoline
  • Front Wheel Drive
Auction: iaai
  • 52,040 mil
  • Automatic
  • Electric
  • All-Wheel Drive
Auction: iaai
  • 82,737 mil
  • Automatic
  • Flexible Fuel
  • Four Wheel Drive
Auction: iaai
  • 135,484 mil
  • Automatic
  • Gasoline
  • All-Wheel Drive
Auction: iaai
  • 64,081 mil
  • Automatic
  • Gasoline
  • Front Wheel Drive