RENTAL VEHICLE SALE

WBS33HJ01VFX28473 | 2027 BMW M3 COMPETITION

  • VIN VIN

    WBS33HJ01VFX28473

  • Model Year Model Year

    2027

  • Total Drove Total Drove

    1,103 mil

  • Transmission Transmission

    AUTOMATIC

  • Engine Capacity Engine Capacity

    GAS

Vehicle Main Features

On this page, you will discover the complete profile of the 2027 BMW M3, including its full copart bid history and auction history. This 2027 BMW M3 has been meticulously cataloged to provide you with every detail: VIN WBS33HJ01VFX28473, COMPETITION trim, BLUE exterior, and a powerful 3.0L 6 engine running on GAS. With AUTOMATIC transmission and ALL WHEEL DRIVE drive, this BMW demonstrates superior performance and reliability.

Enter VIN WBS33HJ01VFX28473 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS33HJ01VFX28473 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document (FL CT) for authenticity and full transparency.

Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on 19 Oct 2026, and verify the mileage of 1,103 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M3 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.

  • Engine Capacity Engine Capacity : 1,103 mil
  • Fuel Fuel : GAS
  • Color Color : BLUE
  • Keys Keys : YES
  • Body Type Body Type : SEDAN
  • Transmission Transmission : AUTOMATIC
  • Engine Engine : 3.0L 6
  • Drive line Drive line : ALL WHEEL DRIVE
  • Damage Damage : SIDE REAR END
  • Auction Auction : copart
  • Location Location : RENTAL VEHICLE SALE

Similar Vehicles

Auction: copart
  • 426 mil
  • AUTOMATIC
  • GAS
  • ALL WHEEL DRIVE
Auction: copart
  • 2,075 mil
  • AUTOMATIC
  • GAS
  • ALL WHEEL DRIVE
Auction: copart
  • AUTOMATIC
  • GAS
  • ALL WHEEL DRIVE
Auction: copart
  • 40,305 mil
  • AUTOMATIC
  • GAS
  • FOUR BY FOUR
Auction: copart
  • 17,741 mil
  • AUTOMATIC
  • GAS
  • ALL WHEEL DRIVE
Auction: copart
  • 23,820 mil
  • AUTOMATIC
  • GAS
  • ALL WHEEL DRIVE