WBS33HK08VCY73753 | 2027 BMW M4 COMPETITION
- Copart
- Lot #: 71895866
Vehicle Main Features
On this page, you will discover the complete profile of the 2027 BMW M4, including its full copart bid history and auction history. This 2027 BMW M4 has been meticulously cataloged to provide you with every detail: VIN WBS33HK08VCY73753, COMPETITION trim, BLACK exterior, and a powerful 3.0L 6 engine running on GAS. With AUTOMATIC transmission and ALL WHEEL DRIVE drive, this BMW demonstrates superior performance and reliability.
Enter VIN WBS33HK08VCY73753 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS33HK08VCY73753 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document (AZ CT) for authenticity and full transparency.
Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on 19 Oct 2026, and verify the mileage of 426 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M4 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.
-
Engine Capacity :
426 mil
-
Fuel :
GAS
-
Color :
BLACK
-
Keys :
YES
-
Body Type :
COUPE
-
Transmission :
AUTOMATIC
-
Engine :
3.0L 6
-
Drive line :
ALL WHEEL DRIVE
-
Damage :
WATER/FLOOD MINOR DENT/SCRATCHES
-
Auction :
copart
-
Location :
RENTAL VEHICLE SALE
Similar Vehicles
WBA63FB09TFX13950 BMW M4 2026 Upcoming
-
2,075 mil
-
AUTOMATIC
-
GAS
-
ALL WHEEL DRIVE
-
AUTOMATIC
-
GAS
-
ALL WHEEL DRIVE
WBAGV8C00MCF81417 BMW M8 2021 Upcoming
-
112,750 mil
-
AUTOMATIC
-
GAS
-
ALL WHEEL DRIVE
WBS33HJ01VFX28473 BMW M3 2027 Upcoming
-
1,103 mil
-
AUTOMATIC
-
GAS
-
ALL WHEEL DRIVE
3TYLB5JN7RT008450 TOYOTA TACOMA 2024 Upcoming
-
40,305 mil
-
AUTOMATIC
-
GAS
-
FOUR BY FOUR
WMZ23GA05S7R50646 MINI COOPER 2025 No result
-
17,741 mil
-
AUTOMATIC
-
GAS
-
ALL WHEEL DRIVE