Sayreville

WBS83CH03MCH46667 | 2021 BMW M5

  • VIN VIN

    WBS83CH03MCH46667

  • Model Year Model Year

    2021

  • Total Drove Total Drove

    483 mil

  • Transmission Transmission

    Automatic

  • Engine Capacity Engine Capacity

    Gasoline

Vehicle Main Features

On this page, you will discover the complete profile of the 2021 BMW M5, including its full iaai bid history and auction history. This 2021 BMW M5 has been meticulously cataloged to provide you with every detail: VIN WBS83CH03MCH46667, trim, Blue exterior, and a powerful 4.4L TwinPower Turbo V8 engine running on Gasoline. With Automatic transmission and All-Wheel Drive drive, this BMW demonstrates superior performance and reliability.

Enter VIN WBS83CH03MCH46667 to unlock high-resolution photos showcasing the exterior, interior, engine bay, and undercarriage. Each image is tagged by VIN WBS83CH03MCH46667 to guarantee precision. You will also find detailed damage reports, repair estimates, and structural insights that highlight dents, scratches, and panel replacements. Our platform provides the original title document (SALVAGE-NJ) for authenticity and full transparency.

Review the timeline of bids to understand market value trends, compare opening bids to the final sale price on 13 Apr 2022, and verify the mileage of 483 miles. Whether you are evaluating, purchasing, or selling, the comprehensive data on this M5 and BMW equips you with the knowledge to make confident decisions. Discover full vehicle history, damage information, high-resolution photos, and more—all available in one place.

  • Engine Capacity Engine Capacity : 483 mil
  • Fuel Fuel : Gasoline
  • Color Color : Blue
  • Keys Keys : Key Available
  • Body Type Body Type : Sedan 4 Dr.
  • Transmission Transmission : Automatic
  • Engine Engine : 4.4L TwinPower Turbo V8
  • Drive line Drive line : All-Wheel Drive
  • Damage Damage : Front End
  • Auction Auction : iaai
  • Location Location : Sayreville
  • Seller Seller : New Jersey Manufacturing Group

Similar Vehicles

Auction: iaai
  • 32,704 mil
  • Unknown
  • Hybrid
  • Four Wheel Drive
Auction: iaai
  • 15,395 mil
  • Automatic
  • Gasoline
  • Four Wheel Drive
Auction: iaai
  • 1 mil
  • Unknown
  • Gasoline
  • Four Wheel Drive
Auction: iaai
  • 4,115 mil
  • Automatic
  • Hybrid
  • All-Wheel Drive
Auction: iaai
  • 11,121 mil
  • Unknown
  • Gasoline
  • Front Wheel Drive
Auction: iaai
  • 33,927 mil
  • Automatic
  • Gasoline
  • Rear Wheel Drive